Business IT.
Built to scale.
Office relocations and network builds planned to the hour — cabling, WiFi, firewall, server rack and every workstation live before your team walks in. Installs run after hours and over weekends so you never lose a trading day.

Which one are you?
Both start with a free site assessment and a fixed-scope proposal — no hourly surprises.
Project scope
One-off IT upgrades, office moves, and infrastructure deployments.
- Site survey at old & new premises
- Cabling and WiFi built ahead of move day
- Weekend cutover — ISP, firewall, server rack, phones
- Every desk tested and labelled before Monday
Regular retainer
Proactive monitoring, helpdesk support, and fully managed IT for a fixed monthly fee.
- Heat-mapped WiFi design, no dead zones
- Cat6A/Cat7 structured cabling, Fluke certified
- VLAN segmentation, firewall & VPN
- Server rack, patch panel, UPS
What we build.
Six disciplines, one accountable team — no subcontractor finger-pointing.
Structured cabling
Enterprise-grade Cat6A/Cat7 installations with certified testing and lifetime warranty.
Enterprise WiFi
High-density WiFi 6E deployments with seamless roaming and zero dead zones.
Network security
Multi-layered security with next-gen firewalls, IDS/IPS and zero-trust architecture.
Server infrastructure
Rack installations, virtualization and hybrid cloud integration.
Cloud connectivity
Direct connections to AWS, Azure and Google Cloud with optimised routing.
Network monitoring
24/7 NOC services with proactive alerts and real-time performance dashboards.
How a project runs.
Click a phase — every one has named deliverables and a fixed duration.
Discovery & assessment
1–2 daysComprehensive site survey, current-infrastructure analysis and documented business requirements.
- Site Survey Report
- Network Assessment
- Requirements Document
Design & planning
2–3 daysDetailed network architecture diagrams, cable pathways and equipment specifications.
- Network Diagram
- Bill of Materials
- Project Timeline
Implementation
3–10 daysProfessional installation with minimal disruption. All work done after hours if required.
- Physical Installation
- Configuration
- Testing
Handover & support
1 dayFull documentation, training for your team and ongoing maintenance agreements.
- Documentation
- Training Session
- Support Contract
The move-week runbook.
What actually happens when you're relocating — published so you can hold us to it.
One move, start to finish.
47 seats, Mid Valley → KL Eco City, one weekend
The problem.A professional-services firm signed a new lease with three weeks' notice. The old cabinet had been patched by four different vendors over nine years — no labels, no diagram, two switches nobody could log into. Their previous IT vendor quoted “we'll see on the day”.
What we did. Surveyed both premises in one visit. Cabled and Fluke-certified the new floor 11 days before the move, while the old office kept working. Ordered the fibre line early — it landed 4 days late, so we ran the first Monday on a bonded 5G failover nobody noticed. Struck the old site Friday 7PM, cut over Saturday, tested department by department Sunday.
“We told staff to expect a day off. Nobody needed it — Monday morning everyone just logged in.”
— Operations Director · professional services, 47 staffunlabelled patch spaghetti
labelled patch panel, clean cable comb & UPS
What a lost day actually costs.
Drag to your numbers — the honest comparison between project price and lost business time.
Your downtime calculation
Most move budgets count the vendor invoice and ignore the bigger number: a floor of staff who cannot trade.
* Cost per head per day = fully-loaded payroll, not basic salary. Excludes missed revenue, client SLA penalties and goodwill loss.
What we put in writing.
Contractual commitments, not sales marketing — including the one external risk nobody controls.
Working Monday, or we stay
If your team can't work at 9AM on the first business day, engineers stay on site at no charge until they can. Written into the scope.
Fixed price, itemised
Material and labour listed separately. Variations only with written approval — no discovered-on-site invoices.
Insured & certified
Public liability cover on site, Fluke test certificates per drop, 25-year cabling warranty registered in your name.
The one risk we don't control: ISP lead times
Telco installs slip — regularly. We order early, track weekly, and stage a bonded 5G failover so day one has internet regardless. We tell you this before you sign, not after.
Building management, handled.
The part that derails Malaysian office moves — and the part most IT vendors leave to you.
What you keep at handover.
Yours to keep — full documentation good enough to hand to any engineer, even if you never call us again.
Logical + physical topology, exactly as installed — not as designed.
Every drop mapped to desk, room and panel port on your floor plan.
Certified test result per cable run, PDF, archived for warranty.
Serials, MACs, firmware, warranty dates, licence expiries.
Firewall, switch and AP configs exported and handed over.
Admin accounts in your name — you own the network, not us.
Three ways to move a network.
The honest comparison across execution models.
| What matters on move weekend | Mover's “IT guy” | In-house IT alone | TechFix |
|---|---|---|---|
| New site cabled before the move | Rarely — starts on the day | Depends on capacity | ✓ Pre-built + certified 1–2 weeks ahead |
| Certified cable testing | Not offered | No test equipment | ✓ Fluke certificate per drop, 25-yr warranty |
| Building management permits | Your problem | Your problem | ✓ Prepared, submitted, tracked |
| ISP failover if the line is late | None | Usually none | ✓ Bonded 5G staged as standard |
| Monday morning on site | Gone Saturday | Same team, exhausted | ✓ Engineer floor-walks the first morning |
| Documentation you keep | None | Whatever time allowed | ✓ Full handover pack, credentials in your name |
| Price certainty | Day-rate, open-ended | Hidden opportunity cost | ✓ Fixed scope after free survey |
Azhar R.
Senior Network Engineer · 11 years · leads relocations end to endOne person owns your project from survey to Monday floor-walk — the same engineer who designed the network is on site when it goes live. You get their mobile number, not a ticket queue.
Free site assessment, fixed-scope proposal.
An engineer walks your floor, then you get a written scope with a bill of materials and a timeline — not an hourly estimate. Assessment costs nothing and there is no obligation to proceed.
Frequently Asked Questions
Common questions about office relocations, cabling standards, and network setup in Malaysia.
What is included in office networking setup services?
How long does office network installation take in Malaysia?
Are your network engineers certified?
Do you provide ongoing network support?
What is your network uptime guarantee?
Explore Our B2B IT Solutions
Complete IT support ecosystem for Malaysian businesses
Business IT Support
Responsive on-site and remote IT support for businesses of all sizes.
Learn moreServer Support
24/7 server monitoring and management with 15-min response SLA.
Learn moreCybersecurity for SMEs
Protect your business with enterprise-grade security solutions.
Learn moreCorporate IT Solutions
Comprehensive IT strategy and infrastructure for enterprises.
Learn moreGet a Custom Quote
Tailored pricing for your networking requirements.
Learn more