Find the Right Business IT Support
Owner in Malaysia.
Use this page to choose the correct TechFix service owner: incidents go to IT Support, recurring operations to Managed IT, server work to Server Support, and defined workplace builds to Office Networking — cabling, Wi-Fi, firewall, server rack and workplace handover requirements documented before implementation. Required work windows, outage risks and third-party dependencies are recorded in the proposal before approval.

Which one are you?
Both start with a site assessment and a written proposal. Any assessment fee is confirmed before booking.
Project scope
One-off IT upgrades, office moves, and infrastructure deployments.
- Site survey at old & new premises
- Cabling and WiFi built ahead of move day
- Weekend cutover — ISP, firewall, server rack, phones
- Every desk tested and labelled before Monday
Regular retainer
Monitoring, helpdesk support and managed IT can be scoped under a monthly agreement.
- Wi-Fi design based on the agreed survey scope
- Cat6A/Cat7 structured cabling with agreed test records
- VLAN segmentation, firewall & VPN
- Server rack, patch panel, UPS
What we build.
Six disciplines, one accountable team — no subcontractor finger-pointing.
Structured cabling
Cat6A/Cat7 installation, labelling and testing scoped to the site and handover requirements.
Enterprise WiFi
Wi-Fi coverage planning and deployment based on the premises, device density and survey findings.
Network security
Multi-layered security with next-gen firewalls, IDS/IPS and zero-trust architecture.
Server infrastructure
Rack installations, virtualization and hybrid cloud integration.
Cloud connectivity
Direct connections to AWS, Azure and Google Cloud with optimised routing.
Network monitoring
Monitoring coverage, alerts, reporting and escalation paths defined in the approved support scope.
How a project runs.
Click a phase — every one has named deliverables and a fixed duration.
Discovery & assessment
1–2 daysComprehensive site survey, current-infrastructure analysis and documented business requirements.
- Site Survey Report
- Network Assessment
- Requirements Document
Design & planning
2–3 daysDetailed network architecture diagrams, cable pathways and equipment specifications.
- Network Diagram
- Bill of Materials
- Project Timeline
Implementation
3–10 daysProfessional installation with minimal disruption. All work done after hours if required.
- Physical Installation
- Configuration
- Testing
Handover & support
1 dayFull documentation, training for your team and ongoing maintenance agreements.
- Documentation
- Training Session
- Support Contract
The move-week runbook.
What actually happens when you're relocating — published so you can hold us to it.
A seven-device company repair batch.
Seven MacBooks assessed and repaired under one company invoice
The request. A company submitted seven MacBook device lines under one invoice. The recorded issues included swollen batteries and devices that could not operate normally without a charger.
Recorded work. The paid invoice contains seven repair lines across MacBook Air A1466, MacBook Pro A2159 and MacBook Pro A1278 devices. The work descriptions cover battery replacement and one combined battery and I/O-board replacement.
Evidence boundary: this summary uses quantities, models, work descriptions and invoice value from the operational record. It does not claim an unrecorded turnaround time, saving, satisfaction score or customer endorsement.
— TechFix invoice record, customer anonymizedreported battery and power faults
battery and I/O-board replacements
What a lost day actually costs.
Drag to your numbers — the honest comparison between project price and lost business time.
Your downtime calculation
Most move budgets count the vendor invoice and ignore the bigger number: a floor of staff who cannot trade.
* Cost per head per day = fully-loaded payroll, not basic salary. Excludes missed revenue, client SLA penalties and goodwill loss.
What we put in writing.
Contractual commitments, not sales marketing — including the one external risk nobody controls.
Cutover acceptance plan
The proposal defines the test plan, cutover window, named owners and post-cutover support before work begins.
Fixed price, itemised
Material and labour listed separately. Variations only with written approval — no discovered-on-site invoices.
Evidence agreed in scope
Required test records, labels, diagrams and warranty documents are listed in the proposal before approval.
The one risk we don't control: ISP lead times
Telco installs can slip. The project plan records provider dependencies and any separately approved temporary-connectivity option before cutover.
Building management, handled.
The part that derails Malaysian office moves — and the part most IT vendors leave to you.
What you keep at handover.
Yours to keep — full documentation good enough to hand to any engineer, even if you never call us again.
Logical + physical topology, exactly as installed — not as designed.
Every drop mapped to desk, room and panel port on your floor plan.
Required test method, result format and warranty documents agreed in the proposal.
Serials, MACs, firmware, warranty dates, licence expiries.
Firewall, switch and AP configs exported and handed over.
Admin accounts in your name — you own the network, not us.
Three ways to move a network.
The honest comparison across execution models.
| What matters on move weekend | Mover's “IT guy” | In-house IT alone | TechFix |
|---|---|---|---|
| New site cabled before the move | Rarely — starts on the day | Depends on capacity | ✓ Pre-built and tested before the agreed cutover |
| Cable testing evidence | Not offered | No test equipment | ✓ Test records and warranty terms defined in scope |
| Building management permits | Your problem | Your problem | ✓ Prepared, submitted, tracked |
| ISP failover if the line is late | None | Usually none | ✓ Bonded 5G staged as standard |
| Monday morning on site | Gone Saturday | Same team, exhausted | ✓ Engineer floor-walks the first morning |
| Documentation you keep | None | Whatever time allowed | ✓ Full handover pack, credentials in your name |
| Price certainty | Day-rate, open-ended | Hidden opportunity cost | ✓ Fixed scope after free survey |
Named in the approved proposal
Delivery owner · escalation contact · acceptance ownerThe proposal identifies who owns delivery, escalation and acceptance. Staffing and required competencies are confirmed for the actual scope rather than attributed to an unverified public profile.
Site assessment and fixed-scope proposal.
After reviewing the premises and requirements, TechFix can issue a written scope with the bill of materials, dependencies and proposed timeline. Any assessment fee or prerequisite is confirmed before the visit.
Frequently Asked Questions
Common questions about office relocations, cabling standards, and network setup in Malaysia.
What can TechFix assess for an office network project?
How long does an office network installation take?
Will we receive test and handover records?
Do you provide ongoing network support?
Do you guarantee network uptime?
Explore Our B2B IT Solutions
Complete IT support ecosystem for Malaysian businesses
Corporate IT Procurement
Plan and source business devices against documented requirements.
Learn moreServer Support
Assess server monitoring, maintenance, escalation ownership and support coverage.
Learn moreRemote Hands IT Support
On-site technical tasks coordinated with your internal or regional IT team.
Learn moreIT Infrastructure Setup
Plan office networks, server rooms, workplace systems, and handover.
Learn moreCybersecurity for SMEs
Protect your business with enterprise-grade security solutions.
Learn moreCorporate IT Solutions
Comprehensive IT strategy and infrastructure for enterprises.
Learn moreGet a Custom Quote
Tailored pricing for your networking requirements.
Learn moreEvent Tech Support
On-site technical cover for conferences, launches and roadshows.
Learn more